{"id":441,"date":"2026-10-19T15:28:59","date_gmt":"2026-10-19T21:28:59","guid":{"rendered":"https:\/\/desglosepoliticoslp.com\/?p=441"},"modified":"2026-10-19T15:28:59","modified_gmt":"2026-10-19T21:28:59","slug":"modernizacion-de-la-carretera-tamazunchale-huejutla-registra-avance-de-81-5-por-ciento-en-2026","status":"publish","type":"post","link":"https:\/\/desglosepoliticoslp.com\/?p=441","title":{"rendered":"MODERNIZACI\u00d3N DE LA CARRETERA TAMAZUNCHALE-HUEJUTLA REGISTRA AVANCE DE 81.5 POR CIENTO EN 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 Los trabajos de ampliaci\u00f3n a dos carriles de esta v\u00eda contemplan este a\u00f1o 37 km<br>\u2022 Este camino prioritario beneficiar\u00e1 a 133 mil habitantes de San Luis Potos\u00ed e Hidalgo<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Gobierno de M\u00e9xico, a trav\u00e9s de la Secretar\u00eda de Infraestructura, Comunicaciones y Transportes (SICT), encabezada por Jes\u00fas Esteva Medina, moderniza y ampl\u00eda la carretera federal Tamazunchale-Huejutla, que conecta los estados de San Luis Potos\u00ed e Hidalgo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las obras se realizan por tramos anuales para optimizar los trabajos y en 2026 registran un avance promedio de 81.5 por ciento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este camino prioritario se conecta con el Eje Ciudad Valles-Tampico, lo que mejorar\u00e1 la movilidad de largo itinerario hacia Tamaulipas y el Golfo de M\u00e9xico y permitir\u00e1 a los usuarios ahorrar hasta 65 minutos en los recorridos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La modernizaci\u00f3n de esta v\u00eda consiste en la ampliaci\u00f3n de la carpeta asf\u00e1ltica de 7 a 12 metros de ancho, con dos carriles de circulaci\u00f3n de 3.5 metros (uno por sentido) y acotamientos laterales de 2.5 metros.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una primera etapa, en 2025, la ampliaci\u00f3n abarc\u00f3 27 kil\u00f3metros (km), de los cuales, en el estado de Hidalgo se concluyeron 17 km y cinco puentes; mientras que en San Luis Potos\u00ed se avanz\u00f3 en 10 km y cinco puentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durante 2026, las labores se concentran en 37 km en los tramos Huejutla-Tamazunchale y de Tehuetl\u00e1n a Quetzaltzongo, para lo cual se han desplegado 16 frentes de obra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En Hidalgo las labores abarcan 30 km y cuatro puentes con un progreso de 73 por ciento; mientras que en San Luis Potos\u00ed los trabajos en 7 km y tres puentes registran un avance de 90 por ciento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La carretera Tamazunchale-Huejutla se extiende a lo largo de 158 kil\u00f3metros, y en las labores de modernizaci\u00f3n y ampliaci\u00f3n se invertir\u00e1n 7 mil 886 millones de pesos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las obras concluir\u00e1n en diciembre de 2029, beneficiar\u00e1n a 133 mil habitantes de la regi\u00f3n y generar\u00e1n alrededor de 365 empleos directos y mil 461 indirectos.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/desglosepoliticoslp.com\/wp-content\/uploads\/2026\/10\/WhatsApp-Image-2026-10-19-at-11.27.24-AM-1024x576.jpeg\" alt=\"\" class=\"wp-image-442\" srcset=\"https:\/\/desglosepoliticoslp.com\/wp-content\/uploads\/2026\/10\/WhatsApp-Image-2026-10-19-at-11.27.24-AM-1024x576.jpeg 1024w, https:\/\/desglosepoliticoslp.com\/wp-content\/uploads\/2026\/10\/WhatsApp-Image-2026-10-19-at-11.27.24-AM-300x169.jpeg 300w, https:\/\/desglosepoliticoslp.com\/wp-content\/uploads\/2026\/10\/WhatsApp-Image-2026-10-19-at-11.27.24-AM-768x432.jpeg 768w, https:\/\/desglosepoliticoslp.com\/wp-content\/uploads\/2026\/10\/WhatsApp-Image-2026-10-19-at-11.27.24-AM.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 Los trabajos de ampliaci\u00f3n a dos carriles de esta v\u00eda contemplan este a\u00f1o 37 km\u2022 Este camino<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-441","post","type-post","status-publish","format-standard","hentry","category-sin-categoria"],"_links":{"self":[{"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/posts\/441","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=441"}],"version-history":[{"count":1,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/posts\/441\/revisions"}],"predecessor-version":[{"id":443,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=\/wp\/v2\/posts\/441\/revisions\/443"}],"wp:attachment":[{"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/desglosepoliticoslp.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}